dc.contributor.advisor |
Hossain, Prof. Dr. Md. Monjur |
|
dc.contributor.author |
Masum, Mir Md. Al |
|
dc.date.accessioned |
2018-08-10T13:32:14Z |
|
dc.date.available |
2018-08-10T13:32:14Z |
|
dc.date.copyright |
2001 |
|
dc.date.issued |
2001-11 |
|
dc.identifier.other |
ID 0000000 |
|
dc.identifier.uri |
http://hdl.handle.net/20.500.12228/295 |
|
dc.description |
This thesis is submitted to the Department of Civil Engineering, Bangladesh Institute of Technology(BIT), Khulna in partial fulfillment of the requirements for the degree of Master of Engineering in Civil Engineering, November 2001. |
en_US |
dc.description |
Cataloged from PDF Version of Thesis. |
|
dc.description |
Includes bibliographical references (pages 79-84). |
|
dc.description.abstract |
Piles are used to transfer the loads from the superstructure down to
the soil stratum. where the required resistance is
available. Unless a single pile is used, a pile cap is necessary to spread the vertical
and horizontal loads and
any overturning moment
to all the piles in the
group.
Unlike footing
the base
reaction of pile cap
Consists of a number of concentrated load.
Different methods of designing pile caps are in practice.
Those are
Broadly classified as ACI Building Code and strut-and-lie model (STM). In this
project the cost incurred by
different design approaches are
compared. The
cost of pile caps according to different approaches
is compared considering 4
pile -cap with
constant pile
diameter and column
size but with varying
pile spacing. The comparison reveals that the pile cap designed by
STM costs 5% to 20% lower than AC Building Code for pile spacing 2 to 3 times pile
diameter within a range of 75 to 625 kip of column load.
The experimental ultimate strength of
the pile caps is compared with
that
obtained by different design approaches. The behavior of pile cap at loading
stage is also observed and is seen to agree with other investigators.
It is seen that the experimental strength of pile caps is
higher than
the strength
predicted by
the STM
in comparison to ACI Building Code.
Within the limitation of pile spacing up to 3 times pile diameter, modified
STM is
more rational
than ACI
Building Code in terms of
cost and integrity. |
en_US |
dc.description.statementofresponsibility |
Mir Md. Al Masum |
|
dc.format.extent |
99 pages |
|
dc.language.iso |
en_US |
en_US |
dc.publisher |
Bangladesh Institute of Technology (BIT), Khulna, Bangladesh. |
en_US |
dc.rights |
Khulna University of Engineering & Technology (KUET) thesis/dissertation/internship reports are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. |
|
dc.subject |
Pile Cap |
en_US |
dc.subject |
Building |
en_US |
dc.title |
Study on Pile Cap Design |
en_US |
dc.type |
Thesis |
en_US |
dc.description.degree |
Master of Engineering in Civil Engineering |
|
dc.contributor.department |
Department of Civil Engineering |
|