dc.description |
This thesis is submitted to the Department of Industrial Engineering and Management, Khulna University of Engineering & Technology in partial fulfillment of the requirements for the degree of Master of Science in Engineering in Industrial Engineering and Management, June 2012. |
en_US |
dc.description |
Cataloged from PDF Version of Thesis. |
|
dc.description |
Includes bibliographical references (pages 68). |
|
dc.description.abstract |
Maintenance acts like the heart of the machine. Due to running, every machine
Undergoes wear and tear due to friction. Maintenance of a machine consists of all the
Various activities required to keep machine in standard working condition, so that,
Production operations will not be interrupted by machine failure.
In Eastern Jute mill, there are various types of maintenance such as break-down,
Preventive and overhauling maintenance. Breakdown maintenance may be minor or
Major. Preventive maintenances are routine and periodic. Routine maintenance means
day to day cleaning and greasing. In the factory, periodic maintenance is done strictly
in every week. As a result, all machines run smoothly for the rest six days.
There are different types of machines. The breaker and finisher card machine play an
Important role in the production system of the jute mill. The breaker and finisher card
Machines consist of 7 and 13 repining rollers respectively. Among these, the cylinder
roller is the biggest.
At present, at every 3 months interval, the cylinder roller is repined by dismantling its
150 staves. At that time, the breaker card machine is stopped completely. The rest of
Rollers are repined when they are broken. For this reason, the machine has to be
Stopped frequently. The finisher card machine is stopped every 5 months; the cylinder
roller is repined by dismantling its 189 staves. As a result, the machine becomes idle
and the production system is hampered severely. About four and half lac taka is lost,
if production is hampered for a single day. So, it is found that the jute mill has been
facing a huge amount of loss, if machines are stopped for repair frequently.
The objective of the present study is to investigate the possibility of repining all the
rollers at a time. For this purpose, the break-down data of the above mentioned
machines were collected from the log book from 2005 to 2010. Breakdown interval is
obtained by deducting the two consecutive break-down. Frequency chart of 3-12
months were made for 1 month interval as shown in tables 3, 5, 7, 9, 12, 14, 16.
Total maintenance cost was calculated for different time intervals. Total cost curve is
shown in figures 1, 2, 3, 4, 5, 6, 7 which are U-shaped graphs. The lowest point of U-shaped
graph gives breakdown interval at which the total maintenance cost is
minimum. It is found that production loss can be minimized by repining all the rollers
Including the cylinder at an interval of 6 months for breaker card and for finisher card machine, the same is 7 months. So, the develop model tells us that, if the maintenance
of the breaker card and finisher card is done at an interval of 6 and 7 months respectively, the no. of sudden breakdown of machines will be reduced and at the same time production loss will also be minimum. |
en_US |
dc.description.statementofresponsibility |
Suvendra kumar Ghosh |
|
dc.format.extent |
68 pages |
|
dc.language.iso |
en_US |
en_US |
dc.publisher |
Khulna University of Engineering & Technology (KUET), Khulna, Bangladesh |
en_US |
dc.rights |
Khulna University of Engineering & Technology (KUET) thesis/ dissertation/internship reports are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. |
|
dc.subject |
Procurement and Supply Management |
en_US |
dc.subject |
Inventory Management |
en_US |
dc.subject |
Maintenance Management |
en_US |
dc.title |
Development of Maintenance Plan (Case study : Eastern Jute mills Ltd, Khulna.) |
en_US |
dc.type |
Thesis |
en_US |
dc.description.degree |
Master of Science in Engineering in Industrial Engineering and Management |
|
dc.contributor.department |
Department of Industrial Engineering and Management |
|