KUET Institutional Repository

Development of Maintenance Plan (Case study : Eastern Jute mills Ltd, Khulna.)

Show simple item record

dc.contributor.advisor Uddin, Prof. Dr. Md. Kutub
dc.contributor.author Ghosh, Suvendra kumar
dc.date.accessioned 2018-08-11T05:06:35Z
dc.date.available 2018-08-11T05:06:35Z
dc.date.copyright 2012
dc.date.issued 2012-06
dc.identifier.other ID 0611551
dc.identifier.uri http://hdl.handle.net/20.500.12228/303
dc.description This thesis is submitted to the Department of Industrial Engineering and Management, Khulna University of Engineering & Technology in partial fulfillment of the requirements for the degree of Master of Science in Engineering in Industrial Engineering and Management, June 2012. en_US
dc.description Cataloged from PDF Version of Thesis.
dc.description Includes bibliographical references (pages 68).
dc.description.abstract Maintenance acts like the heart of the machine. Due to running, every machine Undergoes wear and tear due to friction. Maintenance of a machine consists of all the Various activities required to keep machine in standard working condition, so that, Production operations will not be interrupted by machine failure. In Eastern Jute mill, there are various types of maintenance such as break-down, Preventive and overhauling maintenance. Breakdown maintenance may be minor or Major. Preventive maintenances are routine and periodic. Routine maintenance means day to day cleaning and greasing. In the factory, periodic maintenance is done strictly in every week. As a result, all machines run smoothly for the rest six days. There are different types of machines. The breaker and finisher card machine play an Important role in the production system of the jute mill. The breaker and finisher card Machines consist of 7 and 13 repining rollers respectively. Among these, the cylinder roller is the biggest. At present, at every 3 months interval, the cylinder roller is repined by dismantling its 150 staves. At that time, the breaker card machine is stopped completely. The rest of Rollers are repined when they are broken. For this reason, the machine has to be Stopped frequently. The finisher card machine is stopped every 5 months; the cylinder roller is repined by dismantling its 189 staves. As a result, the machine becomes idle and the production system is hampered severely. About four and half lac taka is lost, if production is hampered for a single day. So, it is found that the jute mill has been facing a huge amount of loss, if machines are stopped for repair frequently. The objective of the present study is to investigate the possibility of repining all the rollers at a time. For this purpose, the break-down data of the above mentioned machines were collected from the log book from 2005 to 2010. Breakdown interval is obtained by deducting the two consecutive break-down. Frequency chart of 3-12 months were made for 1 month interval as shown in tables 3, 5, 7, 9, 12, 14, 16. Total maintenance cost was calculated for different time intervals. Total cost curve is shown in figures 1, 2, 3, 4, 5, 6, 7 which are U-shaped graphs. The lowest point of U-shaped graph gives breakdown interval at which the total maintenance cost is minimum. It is found that production loss can be minimized by repining all the rollers Including the cylinder at an interval of 6 months for breaker card and for finisher card machine, the same is 7 months. So, the develop model tells us that, if the maintenance of the breaker card and finisher card is done at an interval of 6 and 7 months respectively, the no. of sudden breakdown of machines will be reduced and at the same time production loss will also be minimum. en_US
dc.description.statementofresponsibility Suvendra kumar Ghosh
dc.format.extent 68 pages
dc.language.iso en_US en_US
dc.publisher Khulna University of Engineering & Technology (KUET), Khulna, Bangladesh en_US
dc.rights Khulna University of Engineering & Technology (KUET) thesis/ dissertation/internship reports are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.
dc.subject Procurement and Supply Management en_US
dc.subject Inventory Management en_US
dc.subject Maintenance Management en_US
dc.title Development of Maintenance Plan (Case study : Eastern Jute mills Ltd, Khulna.) en_US
dc.type Thesis en_US
dc.description.degree Master of Science in Engineering in Industrial Engineering and Management
dc.contributor.department Department of Industrial Engineering and Management


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search KUET IR


Browse

My Account

Statistics